HSIP/HR3 Apps Received

We (District 3 Local Assistance) have received the following applications for the latest “Combined Call” for Highway Safety Improvement Program (HSIP) and High Risk Rural Road Program (HR3) Projects.  These applications, which were due to us last Friday, July 20, will be reviewed here in the District, forwarded to our HQ, and ultimately an approved list will be broadcast in September.  Please contact John Hoole (530-741-5450) or Jim Day (530-741-5116) IMMEDIATELY if you don’t see your project on the list or if we have an incorrect listing.

Updated 7/30/12: We’ve received the following 31 Applications, listed in alphabetical order by agency:

Unique Project ID Project Location
03-Butte County-1 The segment of Durham Pentz Rd – From SR 99 to SR191
03-Butte County-2 The intersection of East Gridley Rd. and Larkin Rd.
03-Citrus Heights-1 Old Auburn Road from approximately 185 feet northeast of Linda Creek Court to approximately 180 feet northeast of Argo Drive.
03-City of Elk Grove-1 Franklin Boulevard from Elk Grove Boulevard to Big Horn Boulevard and Bruceville Road from Elk Grove Boulevard to Big Horn Boulevard
03-City of Elk Grove-2 Various intersections located throughout the City
03-Colusa County-1 Sites Ladoga Road, Grapevine Grade, PM 8.8 to PM 9.2
03-Davis-1 Fifth Street between A and L Streets, between Downtown Davis and the Old North Davis neighborhood
03-El Dorado County-1 On Green Valley Rd between Francisco Dr and Silva Valley Pkwy
03-Lincoln-1 along Lincoln Boulevard (existing State Route 65) from Sterling Parkway to 7th Street
03-Nevada County-1 Alta Sierra Drive, Banner Lava Cap Road, East Bennett Street, Greenhorn Road, Indian Springs Road, La Barr Meadows  Road, Lime Kiln Road, McCourtney Road and North Bloomfield  Road.
03-Nevada County-2 Lime Kiln Road, Between McCourtney Road and Wolf Road.
03-Oroville-1 Intersection of Oro Dam Blvd, Orange Avenue, and Acacia Avenue.
03-Oroville-2 Feather River Blvd, Myers St, Montgomery St, 5&7 Ave, Wyandotte Rd, Lower Wyandotte Rd, Oro Dam Blvd, Mitchell Ave, Lincoln St, Grand Ave, Table Mountain Blvd, Foothill Blvd, Washington Ave, Nelson Ave, Olive Hwy, Orange Ave, Oro Quincy Hwy
03-Paradise-1 Skyway from Town Hall to Elliott Rd and Pearson Rd
03-Placer County-1 Various locations throughout Placer County, a systematic application.
03-Placer County-2 Various locations throughout Placer County, a systematic application
03-Placer County-3 Various locations throughout Placer County, a systematic application
03-Placer County-4 Auburn Folsom Road; approximately 60 feet north of Willow Lane south to Robin Hood Lane in Placer County.
03-Rancho Cordova-1 The intersection of Aramon Drive/Studarus Drive and Coloma Road.
03-Rancho Cordova-2 This project is located on Coloma Road from Folsom Boulevard to Sunrise Boulevard.
03-Rancho Cordova-3 The intersection of Douglas Road and Grant Line Road.
03-Roseville-1 Roseville Road
03-Sacramento County-1 Fair Oaks Boulevard between Day Drive and Arden Way
03-Sacramento County-2 Howe Avenue between El Camino Avenue and Shaw Street
03-Sacramento County-3 Various signalized intersection locations throughout the unincorporated County, ten total.
03-Sacramento-1 The intersection of Mack Road and Valley Hi Drive / La Mancha Way
03-Truckee-1 Glenshire Drive at Glenshire Dr/Highlands Ave intersection in Truckee, CA (1,500 ft west of the intersection to 1,000 ft east).
03-Yolo County-1 On County Road 98 between County Roads 25A and 27.
03-Yolo County-2 The intersection of County Road 31 and 95
03-Yuba City-1 The project is located at 14 intersections within the City of Yuba City limits in Sutter County.
03-Yuba County-1 Hammonton-Smartsville Road from 0.18 mile east of Doolittle Gate Road for Beale Air Force Base to 2.28 miles east of Doolittle Gate Road

About John Hoole

John, as the District Local Assistance Engineer, is responsible for the administration of the Local Assistance Program in District 3, which covers local and regional agencies in eleven Sacramento Valley and Northern Sierra Counties. He supervises a group of 10-12 Engineers and Planners who ensure delivery of State and Federal funds to the locals. His experience in the District includes Design, Project Management, and Programming, and prior to the District he worked as a Transportation Engineer with the Federal Highway Administration.

5 thoughts on “HSIP/HR3 Apps Received

  1. Thank you for the update, John. Any idea on the tentative date for the broadcast of the approved projects list?
    Mahesh Bhatt

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s