The Final List of Approved Projects for the Highway Safety Improvement Program (HSIP) – Cycle 5 and the High Risk Rural Roads Program (HR3) – Cycle 3.  To view the final HSIP/HR3 approved project list, please go to: http://www.dot.ca.gov/hq/LocalPrograms/HSIP/prev_cycle_results.htm

Now, the fantastic news for District 3!  Out of 31 total applications, we had 1 removed by agency request, 4 were deemed to contain “fatal flaws”, and the remaining 26 projects applications ALL GOT APPROVED!!!  That translates to almost $16 million in federal funds!  Here are our projects:

Application ID Location of Work Description of Work
03-Butte County-1 Durham Pentz Rd. between SR 99 and SR 191 Install rumble stripes, striping, and pavement markers
03-Butte County-2 East Gridley Rd./Larkin Rd. Install traffic signals
03-Davis-1 Intersetions of Fifth St. with C, D, E, I, J and K Streets. Install crosswalks and safety lighting
03-El Dorado County-1 Intersections of Green Valley Rd. with Francisco Dr., El Dorado Hills Blvd  and Silva Valley Pkwy. Upgrade traffic signals (interconnect)
03-Elk Grove-1 Franklin Blvd. between Elk Grove Blvd. and Big Horn Blvd.; Bruceville Rd. between Elk Grove Blvd. and Big Horn Blvd. Upgrade traffic signals (interconnect)
03-Lincoln-1 Lincoln Blvd. (SR 65) between Sterling Pkwy. and 7th St. Upgrade traffic signals; install safety lighting and bike lanes
03-Nevada County-1 Various locations along Alta Sierra Dr., Banner Lava Cap Rd., East Bennett St., Greenhorn Rd., Indian Springs Rd., La Barr Meadows  Rd., Lime Kiln Rd., McCourtney Rd., and North Bloomfield  Rd. Install striping, signs and pavement markers
03-Nevada County-2 Lime Kiln Rd. between McCourtney Rd. and Wolf Rd. Widen shoulders; install striping and pavement markers
03-Oroville-1 Oro Dam Blvd./Orange Ave./Acacia Ave. Install traffic signals
03-Paradise-1 Skyway Rd. between Vista Way and Elliot Rd. Modify traffic signals; install crosswalks
03-Placer County-1 Various locations throughout the county Install pavement markings
03-Placer County-3 Various locations throughout Placer County Install pavement markers
03-Placer County-4 Auburn Folsom Rd. from approximately 60′ N of Willow Ln. to Robin Hood Ln. Construct sidewalks, curb ramps, curb and gutter; install mid-block crosswalk; curve correction
03-Rancho Cordova-1 Aramon Dr. (Studarus Dr.)/Coloma Rd. Install traffic signals
03-Rancho Cordova-2 Coloma Rd. between Folsom Blvd. and Sunrise Blvd. Upgrade traffic signals (interconnect); install traffic cameras
03-Rancho Cordova-3 Douglas Rd./Grant Line Rd. Install traffic signal; widen roadway (to accommodate left-turn and right-turn pockets and bike lanes)
03-Roseville-1 Roseville Rd. from Cirby Way to the city limits Realign roadway
03-Sacramento County-1 Fair Oaks Blvd. between Day Dr. and Arden Way Install sidewalks, curb ramps, curb and gutter
03-Sacramento County-2 Howe Ave. between El Camino Ave. and Shaw St. Construct sidewalks, curb ramps, curb and gutter; install mid-block signalized crosswalk
03-Sacramento County-3 Ten (10) signalized intersections throughout the city Provide advanced “dilemma zone” protection for the high speed main street approaches at ten existing signalized intersections.
03-Sacramento-1 Mack Rd./Valley Hi Dr. (La Mancha Way) Upgrade traffic signals; install right-turn lane
03-Truckee-1 Glenshire Dr. from 1,500′ W of Highlands Ave. to 1,000′ E of Highlands Ave. Widen to include bike lanes on the shoulders and improve vertical and horizontal alignments or sight distance
03-Yolo County-1 County Road 98 between County Roads 25A and 27 Widen and pave shoulders; remove fixed objects
03-Yolo County-2 County Road 31/County Road 95 Install left-turn lanes
03-Yuba City-1 14 intersections within the City limits Upgrade bike lanes striping
03-Yuba County-1 Hammonton-Smartsville Rd. from 0.18 mile E of Doolittle Gate Rd. to 2.28 miles E of Doolittle Gate Rd. Widen and pave shoulders, curve correction

On Wednesday, a statewide distribution announcement for the HSIP Cycle 5 and HR3 Cycle 3 results will be released.

Keep in mind that this is not an authorization to begin reimbursed work.  The MPOs will be informed of each project being approved for funding.  Caltrans HQ staff will work with the MPOs to include each project in their next FSTIP Amendment.  Immediately after the FSTIP Amendment has been approved by FHWA, you will be notified of its approval and may then submit a request for authorization (RFA) to begin reimbursable work on the project in accordance with federal-aid project implementation procedures.

If you have any questions, please contact our HSIP/HR3 Coordinator, Jim Day, at (530) 741-5116.

About John Hoole

John, as the District Local Assistance Engineer, is responsible for the administration of the Local Assistance Program in District 3, which covers local and regional agencies in eleven Sacramento Valley and Northern Sierra Counties. He supervises a group of 10-12 Engineers and Planners who ensure delivery of State and Federal funds to the locals. His experience in the District includes Design, Project Management, and Programming, and prior to the District he worked as a Transportation Engineer with the Federal Highway Administration.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s