Reminder for HBP Surveys

This is a gentle reminder that the 2014 HBP Surveys are due back to the Districts by close of business, Friday September 12, 2014.
Thank you to those who have already submitted their bridge surveys.  For those who haven’t yet, please submit the bridge surveys to your bridge engineer as shown below.  The surveys are for bridge projects that have funds programmed either in current or future years of the FTIP.

Michael McCollum, (530) 741-5453, michael.mccollum@dot.ca.gov
     Butte County, Colusa County, Glenn County, Sierra County
Darlene Wulff, (530) 740-4992, darlene.wulff@dot.ca.gov
     El Dorado County, Nevada County, Sutter County, Yuba County
Bob Baca,(530) 741-5121, bob.baca@dot.ca.gov
     Sacramento County, Placer County, Yolo County

The reason for this survey is to update the FTIP for all Highway Bridge Program (HBP) and Prop 1B Seismic projects. Some slight modifications to the survey have been made. We are now capturing the authorization milestones, so please make sure this information is entered on the survey. Please note that the PE Authorization and Right of Way Authorization dates should only be completed with the dates that FHWA has given authorization to proceed for the phase.  

Again, this survey must be returned (email requested) to the district office no later than COB, Friday September 12, 2014.  

Thanks

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s