Highway Safety Improvement Program Webinar Recap

HSIP Webinar was recorded on Feb. 26, 2015 (the recording and hand-outs will be available on the CALTRANS website below in two days)

• The call for applications will be in April, 2015
• The closing date will be 3 months later
o Agencies with red-flags on current HSIP/HRRR projects may submit applications only if they clear the red-flags prior to the Cycle 7 closing date
• The expected announcement of projects selected is October, 2015

Total amount available statewide: $150Mil.
• Set-aside for District 3: $0 (there are no set-asides this cycle)
• Maximum limit of HSIP funds any agency can have: $10Mil
• Maximum limit of HSIP funds any project can have: $10Mil
• Minimum limit of HSIP funds any project can have: $100K

Reimbursement Rate: 90% Federal / 10% local or state match*
• There are countermeasures that qualify for 100% reimbursement (see appendix B of the Local Roadway Safety Manual)

The minimum benefit /cost ratio (B/C) is 5.0 (HRRR projects may be selected with a lower score to meet MAP-21 requirements)

For draft copies of the guidelines, checklists, and forms available on-line, click here.

For further questions or comments contact:

J.P. Day
Caltrans-District 3
Office of Local Assistance
703 B Street, Marysville, CA 95901
(530) 741-5116

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s